AcuRite 00607 Specifikace Strana 121

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 224
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 120
117
Southwestern Industries, Inc.
ProtoTRAK SMX K2, K3, K4 & Retrofit Safety, Installation, Maintenance, Service & Parts List Manual
6.0 Retrofit Installation
This section of the manual is intended to provide step-by-step instructions for installing a
ProtoTRAK SMX 2 or 3-axis control on a vertical knee milling machine. Within Sections 6,
7 and 8 it may refer to other sections of the manual for certain procedures or figures.
6.1 Installation Tools and Hardware
The following section lists the required tools and hardware for installing a ProtoTRAK SM
control. It also lists the pre-installation requirements needed to complete the retrofit at
the customers shop.
6.2 Required Tools/Hardware
The following tools are necessary for a typical installation:
Allen wrenches, set, inch and metric
Drill motor
Drills, set
Taps, set, and tap handle
Machinist square
Bubble level
Crescent wrench, 10”
Torque wrench, up to 60 ft/lbs.
Crowfoot wrench, 1 1/4” open end to fit torque wrench
Socket set with 3” and 6” extension and ratchet wrench
Dial calipers
Flat blade screwdriver set
Phillips screwdriver set
Standard or gauge blocks, 6”/150mm
Gauge block, 75mm or 3”
.0001” dial indicator and magnetic base
Center punch
Hammer, small
Combination wrenches, set, 3/8” to 15/16”
Counterbores or step drills set
Combination wrench, 10mm
Transfer punch set
Transfer screw set
Feeler gage (Z glass scales)
Pliers set
File set
Xacto knife with flat blade
3/4” 2 flute end mill
Safety glasses
Zobrazit stránku 120
1 2 ... 116 117 118 119 120 121 122 123 124 125 126 ... 223 224

Komentáře k této Příručce

Žádné komentáře